Logo SarnafilYour Worldwide Partner for Roofing and Waterproofing Solutions
 NewsAbout usContact usWorldwideInfoNet
PrintSearchContactSitemapHome
Visual
 RoofingStandard DetailsReference Projects
 

Design Considerations
General
Acoustic Performance
Aesthetic Appearance
Building Regulations Part L&J
Compatability
Drainage
Fire Performance
Health & Safety
Lightning Protection
Maintenance
Programme
Roof Access
Roof Refurbishment
Sustainability
Wind Uplift
Decking
Vapour Control
Insulation
Single Ply Membranes
Detailing
 
Roofing | Design Considerations | General | Roof Access  


Roof Access

Sarnafil SarnaTred Access Walkway Resistance to Roof Traffic

Consideration should be given to the suitability for roof traffic both during and after construction.  If necessary areas that will sustain heavy foot traffic after installation but prior to completion should be adequately protected.  Suitable provision should be made for maintenance access to plant and any other areas requiring regular access.

Sarnafil Ltd offers guidance in the treatment of such areas including the provision of the SarnaTred walkway pad that is simply hot air welded to the finished roof.

Bluewater Shopping Centre - Under Construction Temporary Protection of Roof System

Full temporary protection of the roofing is essential if following trades are to use the finished roof as a working platform or access walkway.  The responsibility for ensuring this must be agreed between relevant parties during the course of the building operations.  In general, no building work should be carried out from a completed roof.  Paint, cementitious materials, plaster and solvents should not be allowed to come into contact with the completed roof surfacing.

Battersea Dogs Home, Bellmead Kennels, Windsor The completed roof should NOT be used as a working platform.