Roof Access
 |
 |
Resistance to Roof Traffic
Consideration
should be given to the suitability for roof traffic both during and after construction. If necessary
areas that will sustain heavy foot traffic after installation but prior to completion should be adequately
protected. Suitable provision should be made for maintenance access to plant and any other areas
requiring regular access.
Sarnafil Ltd offers guidance
in the treatment of such areas including the provision of the SarnaTred walkway pad that is simply hot
air welded to the finished roof.
|
 |
 |
 |
Temporary Protection of Roof System
Full
temporary protection of the roofing is essential if following trades are to use the finished roof as
a working platform or access walkway. The responsibility for ensuring this must be agreed between
relevant parties during the course of the building operations. In general, no building work should
be carried out from a completed roof. Paint, cementitious materials, plaster and solvents should
not be allowed to come into contact with the completed roof surfacing.
|
 |
 |
 |
The completed roof should NOT be used as a working platform.
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|