Logo SarnafilYour Worldwide Partner for Roofing and Waterproofing Solutions
 NewsAbout usContact usWorldwideInfoNet
PrintSearchContactSitemapHome
Visual
 RoofingStandard DetailsReference Projects
 

Refurbishment
Factors Affecting Roof Life
Refurbishment Systems
Overlay
Partial Strip
Complete Strip
Expert Advice
Installation Inspection
Guarantees
Trust Sarnafil
Building Regulation Part L
 
Roofing | Refurbishment | Refurbishment Systems | Overlay  


Overlay

With this option, the existing waterproofing is used as a vapour control layer. This is subject to detailed examination and an evaluation of how it is attached to the substrate, to ensure that the new roof will not fail due to wind uplift.

Overlays can be carried out using adhered, mechanically fastened or loose laid ballasted systems.  Examples of where an overlay would be recommended are;


  • If the roofing system needs to be upgraded to meet the requirements of Building Regulations Part L 2006, (England & Wales)
  • If there is limited moisture in the current system that has not yet affected the roofing system



Overlay

Other Options
Partial Strip
Complete Strip




© 2006 Sarnafil Ltd.    Legal Disclaimer